Beer Brewing System mod. Start 2 to 10 HL

+ IVA

Spedizione esclusa

PRODUCT DESCRIPTION

  • Power supply: Flame or Electric;
  • No.2 vats;
  • Heating type: Direct flame (natural gas/LPG) – Electric ;
  • System voltage: 220V (2 hl flame) 400V three-phase 2.5 to 10 hl (single-phase on request) ;
  • Vat 1: mashing and boiling (2 – 5 hl) ;
  • Vat 2: filtration and whirlpool (2 – 5 hl) ;
  • Vat 1: mashing, boiling and whirlpool (6 – 10 hl) ;
  • Vat 2: filtration (6 – 10 hl) ;
  • Double Cooking Room can also be built upon request.
REQUEST A QUOTE OR INFORMATION
 
FILL OUT THE FORM TO:
– Receive a free quote;
– Specialist advice;
– Information on customised installations.
Shopping Cart